The Patriot Files Forums  

Go Back   The Patriot Files Forums > Branch Posts > Army

Post New Thread  Reply
 
Thread Tools Display Modes
  #1  
Old 04-24-2019, 09:33 AM
Boats's Avatar
Boats Boats is offline
Senior Member
 

Join Date: Jul 2002
Location: Sauk Village, IL
Posts: 21,815
Arrow US Army moving out on plans to field eight brigades’ worth of upgunned Strykers

US Army moving out on plans to field eight brigades’ worth of upgunned Strykers
By: Ashley Roque - Janes 360 Weekly / 4-23-19
RE: https://www.janes.com/article/88034/...unned-strykers

Photo link: https://www.janes.com/images/assets/...57323_main.jpg
Stryker Infantry Carrier Vehicles (ICVs) make up the tactical action centre for the 2nd Cavalry Regiment during Dragoon Ready in Hohenfels, Germany, in 2018. The US Army is moving out with a new requirement to upgun its Stryker ICVs with a 30 mm cannon. Source: US Army

The US Army is moving out with a new requirement to add a 30 mm cannon to its double V hulled, Stryker Infantry Carrier Vehicles (ICVs), and seeking industry's help to field eight brigades with the upgunned capability.

In a recent notice posted on the Federal Business Opportunities website, the service laid out its two-phased approach for integrating the new weapon on its Stryker vehicles, an overlapping approach that involves a design integration study with a production competition.

For the first phase, the army is currently seeking contractors interested in participating in a design integration study, and will select up to eight bids that will integrate a government-provided weapon station - which includes a fire-control system, ammunition-handling system, optics system, and gun - onto the vehicle.

"The contractors shall integrate their weapon station design, which includes the XM813 [30 mm] gun, onto the [Stryker ICV]," the service said, before noting that it would then inspect the integration work before it is transported for a "period of performance" that will run from this June until the end of September 2020.

Then in fiscal year 2020, the service will kick-start phase two by issuing a competitive production solicitation and it said it "expects" contractors participating in the study to submit their bids.

"The government anticipates that the potential production prime contractors will demonstrate capabilities and maturity levels required for production and support," the service wrote.

Army leaders will award a single contractor with a five-year, full-rate production contract that will include the option for follow-on years. Over seven years, though, the contract value is set at USD907.4 million for 294 upgunned Strykers to outfit eight brigades.
__________________
Boats

O Almighty Lord God, who neither slumberest nor sleepest; Protect and assist, we beseech thee, all those who at home or abroad, by land, by sea, or in the air, are serving this country, that they, being armed with thy defence, may be preserved evermore in all perils; and being filled with wisdom and girded with strength, may do their duty to thy honour and glory; through Jesus Christ our Lord. Amen.

"IN GOD WE TRUST"
sendpm.gif Reply With Quote
Sponsored Links
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

All times are GMT -7. The time now is 01:25 PM.


Powered by vBulletin, Jelsoft Enterprises Ltd.