The Patriot Files Forums  

Go Back   The Patriot Files Forums > Military News > Navy

Post New Thread  Reply
 
Thread Tools Display Modes
  #1  
Old 03-24-2017, 11:13 AM
Boats's Avatar
Boats Boats is offline
Senior Member
 

Join Date: Jul 2002
Location: Sauk Village, IL
Posts: 21,825
Exclamation Admiral: Carrier Gaps Could Return in 2018

Admiral: Carrier Gaps Could Return in 2018
POSTED BY: HOPE HODGE SECK MARCH 18, 2017
RE: https://www.dodbuzz.com/2017/03/18/a...s-return-2018/

(Photo on site only)
The aircraft carrier USS Carl Vinson (CVN 70) transits the South China Sea March 6, 2017. If U.S. lawmakers fail to approve a full-year budget and rely on a stopgap measure instead, the Navy will face maintenance backlogs and other shortfalls that will keep carriers from deploying on schedule and leave critical coverage gaps around the world, an official said. (U.S. Navy photo/Devin M. Monroe)

If U.S. lawmakers fail to approve a full-year budget and rely on a stopgap measure instead, the Navy will face maintenance backlogs and other shortfalls that will keep its biggest warships from deploying on schedule and leave critical carrier gaps around the world, an official said.

Vice Adm. Joseph Mulloy, deputy chief of naval operations for integration of capabilities and resources, this week said the prospect of shutting down two air wings, going to minimal operations on three more, and delaying 14 ship maintenance availabilities — a scenario predicted by Vice Chief of Naval Operations Adm. Bill Moran in February — was the minimum damage the Navy could expect if the service did not receive the readiness finding it needed for the rest of the fiscal year.

“We have not developed those specifics, but we will relay those to Congress in a classified document later to say what are the impacts,” Mulloy said Thursday during a House Armed Services subcommittee hearing. “It will be that or more, and will very likely be more depending on the date that that kicks in.”

The brunt of the impact, Mulloy said, would be felt in fiscal 2018, which begins Oct. 1, when squadrons and units currently without funding to conduct training workups or maintenance would face related deployment delays.

“You would start seeing the same carrier gaps and start seeing other impacts around the world,” Mulloy said.

The Navy has had to contend with several high-profile carrier gaps in recent months due to sequestration budget caps in 2013, which led to massive maintenance backlogs and threw scheduled ship maintenance availabilities off-schedule.

In October 2015, the carrier Theodore Roosevelt redeployed from the Persian Gulf, leaving the region without a carrier to conduct airstrikes on Islamic State targets — a carrier gap directly linked to maintenance delays for the carrier Dwight D. Eisenhower, which had been scheduled to deploy. In November 2015, the Harry Truman Carrier Strike Group deployed to the region, ending a one-month carrier gap.

Just before the start of 2017, the Eisenhower Carrier Strike Group returned home from the Middle East following a seven-month deployment, leaving a gap of nearly a month while the carrier George H. W. Bush completed preparations for its deployment. This gap too was a direct result of maintenance delays in the shipyard for the Bush.

Congress has until April 28 to pass the fiscal 2017 defense appropriations bill, avoiding a year-long continuing resolution that would keep existing budget caps in place. Mulloy said he also hoped to see predictability in future defense budgets, enabling the Navy to better plan and spend its money.

“For the current 2017 budget … we had approximately three weeks to cut $6.5 billion out of the Department of the Navy, $4.5 billion out of the Navy itself, and $2 billion out of readiness,” he said. “Cutting $6.5 billion out of the Department of the Navy in a matter of weeks causes some very hard choices.”
__________________
Boats

O Almighty Lord God, who neither slumberest nor sleepest; Protect and assist, we beseech thee, all those who at home or abroad, by land, by sea, or in the air, are serving this country, that they, being armed with thy defence, may be preserved evermore in all perils; and being filled with wisdom and girded with strength, may do their duty to thy honour and glory; through Jesus Christ our Lord. Amen.

"IN GOD WE TRUST"
sendpm.gif Reply With Quote
Sponsored Links
  #2  
Old 03-24-2017, 11:15 AM
Boats's Avatar
Boats Boats is offline
Senior Member
 

Join Date: Jul 2002
Location: Sauk Village, IL
Posts: 21,825
Default

Navy’s 355-Ship Fleet Goal Would Cost $25 Billion Per Year
By: POSTED BY: HOPE HODGE SECK FEBRUARY 25, 2017
RE: https://www.dodbuzz.com/2017/02/25/n...lion-per-year/

(This photo is on site only)
The aircraft carrier USS George H.W. Bush (CVN 77) transits the Mediterranean Sea in support of Operation Inherent Resolve on Feb. 21, 2017, in the Mediterranean Sea. A new analysis concludes the Navy would have to spend $25 billion a year for 30 years to reach its stated goal of a 355-ship fleet -- $6 billion a year more than if it stayed on its current track for a 308-ship fleet. (U.S. Navy photo/Daniel Gaither)

A new analysis from the Congressional Budget Office finds the Navy would have to spend $25 billion a year for 30 years to reach its stated goal of a 355-ship fleet, $6 billion a year more than if it stayed on its current track for a 308-ship fleet.

The report, released this month, assessed the costs of the service’s 2017 30-year shipbuilding plan, finding the Navy would need to spend $566 billion to build a fleet of 308 ships, up from the current 274. But the service can expect to spend much more to reach the new goal of 355 ships, announced in December, the report found.

While the full cost implications of the 355-ship fleet will be addressed in a future CBO report, the study laid out broad estimates for the ambitious shipbuilding goal.

The Navy could reach a fleet of 353 ships by 2046 by increasing ship production, CBO staff found. Building 321 ships over 30 years would cost the service $25 billion a year, compared with $19 billion a year if the Navy stayed on its current path.

Under this strategy, the Navy would buy one aircraft carrier every three years instead of one every five, increase inventory of attack submarines and surface combatants by 20 percent, and build to 38 amphibious ships, instead of the current goal of 34.

If the Navy wanted to reach its new fleet goal faster, the report found, it could do so by delaying the retirement of some existing older ships, opting instead to perform upgrades to extend service life and improve combat capabilities.

“The Navy could also build ships faster than assumed in this illustration, but doing so would increase costs in the near term and midterm,” the report’s authors wrote. “Such an approach could be less expensive overall than the alternative described here, but it might not provide the Navy the capabilities that advocates of a larger fleet have in mind.”

Whether or not the Navy budgets for 355 ships, it can expect to spend significantly more than it has been each year to reach its shipbuilding goals.

Between 2013 and 2016, the report found, the president’s budget request averaged $14.7 billion per year for shipbuilding, though Congress boosted that authorization to an average of $16.3 billion per year.

Because of budget caps implemented as a result of sequestration, the Navy bought only 39 ships across that span of years, though its shipbuilding plan called for 45.

Notably, CBO cost estimates are significantly higher than the service’s own figures. Navy officials estimate growth to a 308-ship fleet will cost only $509 billion, $57 billion less than the CBO estimate. They have not publicized a cost figure for a 355-ship fleet.

“CBO’s estimates are higher because its estimating methods and assumptions regarding future ships’ design and capabilities differ from those that the Navy uses and because its treatment of growth in the costs of labor and materials for building ships is different from the Navy’s,” the authors write.

They added that their estimates included corollary costs, including carrier refueling and outfitting ships after delivery.

Regardless of current budget conditions, Navy officials have remained adamant: Sequestration must be lifted, and the fleet must be allowed to grow to 355 ships.

Speaking at a Navy League breakfast this week near Washington, D.C., the Navy’s acting acquisition chief, Allison Stiller, said budget toplines for future years will determine the rate at which the service can reach its ideal force size.

“The 355 is the force structure assessment. That is where we need to go,” she said. “How large the budget is will influence when we can get to that.”
__________________
Boats

O Almighty Lord God, who neither slumberest nor sleepest; Protect and assist, we beseech thee, all those who at home or abroad, by land, by sea, or in the air, are serving this country, that they, being armed with thy defence, may be preserved evermore in all perils; and being filled with wisdom and girded with strength, may do their duty to thy honour and glory; through Jesus Christ our Lord. Amen.

"IN GOD WE TRUST"
sendpm.gif Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

All times are GMT -7. The time now is 08:43 PM.


Powered by vBulletin, Jelsoft Enterprises Ltd.