
David
Fri March 21, 2003 6:49am
|
Patriot PAC-3 ERINT
Patriot Advanced Capability-3 (PAC-3) is a high/medium advanced surface-to-air guided missile air defense system. PAC-3 is a major upgrade to the Patriot system. The PAC-3 Operational Requirements Document (ORD) represents the Army Air Defense need to buy back required battlespace lost against the current and evolving tactical missile and air breathing threat. PAC-3 is needed to ounter/defeat/destroy the 2008 threat and to extend Patriot's capabilities to accomplish new/revised missions. In tandem with the upgraded radar and ground control station, PAC-3 interceptors can protect an area about seven times greater than the original Patriot system.
The PAC-3 Program consists of two interrelated acquisition programs - The PAC-3 Growth Program and the PAC-3 Missile Program. The Growth program consists of integrated, complementary improvements that will be implemented by a series of phased, incrementally fielded material changes. The PAC-3 Missile program is a key component of the overall improvements of the Patriot system, it will provide essential increases in battlespace, accuracy, and kill potential.
PAC-3 is a much more capable derivative of the PAC-2/GEM system in terms of both coverage and lethality. The PAC-3 has a new interceptor missile with a different kill mechanism--rather than having an exploding warhead, it is a hit-to-kill system. The PAC-3 missile is a smaller and highly efficient missile. The canister is approximately the same size as a PAC-2 canister but contains four missiles and tubes instead of a single round. Selected Patriot launching stations will be modified to accept PAC-3 canisters.
The Battalion Tactical Operations Center (BTOC) is an M900 series 5-ton expandable van that has been modified by the addition of data processing and display equipment, and utilized by the battalion staff to command and control the Patriot battalion. The BTOC allows the staff to perform automated tactical planning, communications link planning, and to display situational awareness information.
In the 1997 budget DOD added about $230 million for the PAC-3 through the Future Years Defense Program (FYDP) and established a realistic schedule to lower the program execution risk by extending the engineering and manufacturing development (EMD) phase of the program by ten months. System performance will be improved by re-phasing the missile and radar procurements; upgrading three launchers per battery with Enhanced Launcher Electronics Systems; and extending the battery's remote launch capability. PAC-3 Low-Rate Initial Production (LRIP) will begin in the second quarter of fiscal year 1998, and the First Unit Equipped (FUE) date is planned for the fourth quarter of fiscal year 1999. The FUE capability will consist of 16 missiles and five radars which will be placed in one battalion. As of 1996, in addition to funds being programmed for the Ballistic Missile Defense Organization, the Army planned to spend $9.6 billion for all planned purchases of Patriot missiles, $490 million for modifications and $335 million for product improvements.
The Patriot Advanced Capability 3 (PAC-3) Initial Operational Test and Evaluation (IOTE) began in 2002. The two major objectives of the Initial Operational Test and Evaluation (IOTE) are: (1) To assess the improvements in system performance provided by modifications in terms of operational effectiveness, suitability, and survivability; (2) to verify that modifications do not degrade the existing capabilities. The Initial Operational Test and Evaluation (IOTE) will be the first operational integration and assessment of the complete Patriot Advanced Capability 3 (PAC-3) Configuration 3 system.
The 2nd Battalion 43rd Air Defense Artillery/108th Air Defense Artillery Brigade serves as the test unit for the Initial Operational Test and Evaluation (IOTE). The unit is equipped with the complete package of Patriot Advanced Capability 3 (PAC-3) Configuration 3 hardware, PDB-5+ software and the Patriot Advanced Capability 3 (PAC-3) missile. The Patriot Project Office has issued the upgraded equipment to 2-43 Air Defense Artillery. 2-43 has completed New Equipment Training (NET) and supports testing necessary to obtain material release of the Patriot Advanced Capability 3 (PAC-3) Missile equipment.
The Initial Operational Test and Evaluation (IOTE) is conducted in four phases: (1) The Sustained Operations Phase is a five-day deployment to McGregor Range using approved tactics and doctrine. 2-43 Air Defense Artillery will defend against live aircraft in accordance with threat test support package in a simulated combat environment; (2) The Interoperability Phase is a six-day demonstration of the Patriot Advanced Capability 3 (PAC-3) interoperability with current Army and Joint Theater Missile Defense Systems. This phase is conducted using the Joint Common Simulated Missile Defense System Exerciser or actual tactical equipment; (3) The Flight Mission Simulator (FMS) Phase is a 22-day test of simulated air battles. The mobile Flight Mission Simulator (FMS) is a Patriot missile system simulation used to stimulate and evaluate radar performance, engagement decision and weapon assignment (EDWA) processing and test the Patriot Advanced Capability 3 (PAC-3)’s capabilities against a full spectrum of threat targets; (4) The Missile Flight Test Phase consists of four live missile tests conducted at White Sands Missile Range and Kwajalein Missile Range.
The Air Defense Artillery Directorate of the Operational Test Command conducts the planning and execution of the Initial Operational Test and Evaluation (IOTE). Once Initial Operational Test and Evaluation (IOTE) is complete, the Army Evaluation Center prepares the system evaluation report. This report provides input for the Patriot Advanced Capability 3 (PAC-3) missile Milestone III decision (full rate production) and the materiel release for the complete Patriot Advanced Capability 3 (PAC-3) system.
Four PAC-3 operational tests [some involving more than one interceptor launch] between February 2002 and May 2002 resulted in three launch failures, two misses and one hit that failed to destroy the incoming warhead. A malfunctioning radar and software problems led to the misses, and the launch failures resulted from electrical problems.
The Army received the first 16 PAC-3s -- a full launcher load -- in September 2001. The Army is authorized to produce the missiles at a rate of 72 a year, and Congress authorize an increase to 96 per year in fiscal 2003. The plan is to eventually produce 144 a year, leading to a total inventory of 1,159 interceptors. Unable to certify that the PAC-3 interceptor was ready for stepped-up production, in mid-2002 Pentagon put off the decision for at least a year, and planned on further testing once fixes are in place.
By early 2000 the cost of each PAC-3 missile had increased from $1.9 million to over $4 million, and the estimated total program cost had risen from $3.9 billion to $6.9 billion. After design and manufacturing modifications were initiated to control costs, the estimted cost per missile dropped to about $3 million, and as of mid-2002 program officials expected to reduce the unit cost to $2 million.
Initial reports of a successful intercept of a Patriot missile-as-target by a Pac-3 missile on 25 April 2002 have sinced proven to be incorrect. A US Army statement said that subsequent analysis showed that the Pac-3 impacted the target missile but failed to destroy the warhead, so the intercept was unsuccessful. A second Pac-3 in the same test failed to launch. A PAC-3 missile successfully intercepted a target ballistic missile over Kwajalein Atoll on 30 May 2002. A second missile, however, failed to launch for unknown reasons. A failure to launch also occurred in the last test on 25 April. The target was a modified Minuteman missile with a separating reentry vehicle. This was the last test in the Initial Operational Test and Evaluation (IOT&E) program, prior to a Pentagon assessment of PAC-3’s readiness for full-rate production.
As of late October 2002 the Army had taken delivery of 38 PAC-3 missiles, with another 15 due for delivery by December. The military is under contract to receive an additional 126 missiles over the 2003-2004 period. Congress increased the fiscal year 2003 budget request for PAC-3 of 72 missiles by an additional 48 missiles. In late November 2002, DOD approved plans to double PAC-3 monthly production rates, with the number of missiles increasing from four to eight per month after more manufacturing equipment and a second shift of personnel were added. DOD will acquire 108 PAC-3 missiles in FY 2004.
The overall procurement objective of 1,159 PAC-3 missiles remains unchanged. The larger purchases in FY-03 and FY-04 may be offset by lower production in FY-08 and FY-09. Instead of buying 216 missiles in each of those years, DOD would receive 184 units annually.
|
|

David
Fri March 21, 2003 6:49am
|
Patriot PAC-3 ERINT
Patriot Advanced Capability-3 (PAC-3) is a high/medium advanced surface-to-air guided missile air defense system. PAC-3 is a major upgrade to the Patriot system. The PAC-3 Operational Requirements Document (ORD) represents the Army Air Defense need to buy back required battlespace lost against the current and evolving tactical missile and air breathing threat. PAC-3 is needed to ounter/defeat/destroy the 2008 threat and to extend Patriot's capabilities to accomplish new/revised missions. In tandem with the upgraded radar and ground control station, PAC-3 interceptors can protect an area about seven times greater than the original Patriot system.
The PAC-3 Program consists of two interrelated acquisition programs - The PAC-3 Growth Program and the PAC-3 Missile Program. The Growth program consists of integrated, complementary improvements that will be implemented by a series of phased, incrementally fielded material changes. The PAC-3 Missile program is a key component of the overall improvements of the Patriot system, it will provide essential increases in battlespace, accuracy, and kill potential.
PAC-3 is a much more capable derivative of the PAC-2/GEM system in terms of both coverage and lethality. The PAC-3 has a new interceptor missile with a different kill mechanism--rather than having an exploding warhead, it is a hit-to-kill system. The PAC-3 missile is a smaller and highly efficient missile. The canister is approximately the same size as a PAC-2 canister but contains four missiles and tubes instead of a single round. Selected Patriot launching stations will be modified to accept PAC-3 canisters.
The Battalion Tactical Operations Center (BTOC) is an M900 series 5-ton expandable van that has been modified by the addition of data processing and display equipment, and utilized by the battalion staff to command and control the Patriot battalion. The BTOC allows the staff to perform automated tactical planning, communications link planning, and to display situational awareness information.
In the 1997 budget DOD added about $230 million for the PAC-3 through the Future Years Defense Program (FYDP) and established a realistic schedule to lower the program execution risk by extending the engineering and manufacturing development (EMD) phase of the program by ten months. System performance will be improved by re-phasing the missile and radar procurements; upgrading three launchers per battery with Enhanced Launcher Electronics Systems; and extending the battery's remote launch capability. PAC-3 Low-Rate Initial Production (LRIP) will begin in the second quarter of fiscal year 1998, and the First Unit Equipped (FUE) date is planned for the fourth quarter of fiscal year 1999. The FUE capability will consist of 16 missiles and five radars which will be placed in one battalion. As of 1996, in addition to funds being programmed for the Ballistic Missile Defense Organization, the Army planned to spend $9.6 billion for all planned purchases of Patriot missiles, $490 million for modifications and $335 million for product improvements.
The Patriot Advanced Capability 3 (PAC-3) Initial Operational Test and Evaluation (IOTE) began in 2002. The two major objectives of the Initial Operational Test and Evaluation (IOTE) are: (1) To assess the improvements in system performance provided by modifications in terms of operational effectiveness, suitability, and survivability; (2) to verify that modifications do not degrade the existing capabilities. The Initial Operational Test and Evaluation (IOTE) will be the first operational integration and assessment of the complete Patriot Advanced Capability 3 (PAC-3) Configuration 3 system.
The 2nd Battalion 43rd Air Defense Artillery/108th Air Defense Artillery Brigade serves as the test unit for the Initial Operational Test and Evaluation (IOTE). The unit is equipped with the complete package of Patriot Advanced Capability 3 (PAC-3) Configuration 3 hardware, PDB-5+ software and the Patriot Advanced Capability 3 (PAC-3) missile. The Patriot Project Office has issued the upgraded equipment to 2-43 Air Defense Artillery. 2-43 has completed New Equipment Training (NET) and supports testing necessary to obtain material release of the Patriot Advanced Capability 3 (PAC-3) Missile equipment.
The Initial Operational Test and Evaluation (IOTE) is conducted in four phases: (1) The Sustained Operations Phase is a five-day deployment to McGregor Range using approved tactics and doctrine. 2-43 Air Defense Artillery will defend against live aircraft in accordance with threat test support package in a simulated combat environment; (2) The Interoperability Phase is a six-day demonstration of the Patriot Advanced Capability 3 (PAC-3) interoperability with current Army and Joint Theater Missile Defense Systems. This phase is conducted using the Joint Common Simulated Missile Defense System Exerciser or actual tactical equipment; (3) The Flight Mission Simulator (FMS) Phase is a 22-day test of simulated air battles. The mobile Flight Mission Simulator (FMS) is a Patriot missile system simulation used to stimulate and evaluate radar performance, engagement decision and weapon assignment (EDWA) processing and test the Patriot Advanced Capability 3 (PAC-3)’s capabilities against a full spectrum of threat targets; (4) The Missile Flight Test Phase consists of four live missile tests conducted at White Sands Missile Range and Kwajalein Missile Range.
The Air Defense Artillery Directorate of the Operational Test Command conducts the planning and execution of the Initial Operational Test and Evaluation (IOTE). Once Initial Operational Test and Evaluation (IOTE) is complete, the Army Evaluation Center prepares the system evaluation report. This report provides input for the Patriot Advanced Capability 3 (PAC-3) missile Milestone III decision (full rate production) and the materiel release for the complete Patriot Advanced Capability 3 (PAC-3) system.
Four PAC-3 operational tests [some involving more than one interceptor launch] between February 2002 and May 2002 resulted in three launch failures, two misses and one hit that failed to destroy the incoming warhead. A malfunctioning radar and software problems led to the misses, and the launch failures resulted from electrical problems.
The Army received the first 16 PAC-3s -- a full launcher load -- in September 2001. The Army is authorized to produce the missiles at a rate of 72 a year, and Congress authorize an increase to 96 per year in fiscal 2003. The plan is to eventually produce 144 a year, leading to a total inventory of 1,159 interceptors. Unable to certify that the PAC-3 interceptor was ready for stepped-up production, in mid-2002 Pentagon put off the decision for at least a year, and planned on further testing once fixes are in place.
By early 2000 the cost of each PAC-3 missile had increased from $1.9 million to over $4 million, and the estimated total program cost had risen from $3.9 billion to $6.9 billion. After design and manufacturing modifications were initiated to control costs, the estimted cost per missile dropped to about $3 million, and as of mid-2002 program officials expected to reduce the unit cost to $2 million.
Initial reports of a successful intercept of a Patriot missile-as-target by a Pac-3 missile on 25 April 2002 have sinced proven to be incorrect. A US Army statement said that subsequent analysis showed that the Pac-3 impacted the target missile but failed to destroy the warhead, so the intercept was unsuccessful. A second Pac-3 in the same test failed to launch. A PAC-3 missile successfully intercepted a target ballistic missile over Kwajalein Atoll on 30 May 2002. A second missile, however, failed to launch for unknown reasons. A failure to launch also occurred in the last test on 25 April. The target was a modified Minuteman missile with a separating reentry vehicle. This was the last test in the Initial Operational Test and Evaluation (IOT&E) program, prior to a Pentagon assessment of PAC-3’s readiness for full-rate production.
As of late October 2002 the Army had taken delivery of 38 PAC-3 missiles, with another 15 due for delivery by December. The military is under contract to receive an additional 126 missiles over the 2003-2004 period. Congress increased the fiscal year 2003 budget request for PAC-3 of 72 missiles by an additional 48 missiles. In late November 2002, DOD approved plans to double PAC-3 monthly production rates, with the number of missiles increasing from four to eight per month after more manufacturing equipment and a second shift of personnel were added. DOD will acquire 108 PAC-3 missiles in FY 2004.
The overall procurement objective of 1,159 PAC-3 missiles remains unchanged. The larger purchases in FY-03 and FY-04 may be offset by lower production in FY-08 and FY-09. Instead of buying 216 missiles in each of those years, DOD would receive 184 units annually.
|
|

David
Fri March 21, 2003 6:49am
|
Patriot PAC-3 ERINT
Patriot Advanced Capability-3 (PAC-3) is a high/medium advanced surface-to-air guided missile air defense system. PAC-3 is a major upgrade to the Patriot system. The PAC-3 Operational Requirements Document (ORD) represents the Army Air Defense need to buy back required battlespace lost against the current and evolving tactical missile and air breathing threat. PAC-3 is needed to ounter/defeat/destroy the 2008 threat and to extend Patriot's capabilities to accomplish new/revised missions. In tandem with the upgraded radar and ground control station, PAC-3 interceptors can protect an area about seven times greater than the original Patriot system.
The PAC-3 Program consists of two interrelated acquisition programs - The PAC-3 Growth Program and the PAC-3 Missile Program. The Growth program consists of integrated, complementary improvements that will be implemented by a series of phased, incrementally fielded material changes. The PAC-3 Missile program is a key component of the overall improvements of the Patriot system, it will provide essential increases in battlespace, accuracy, and kill potential.
PAC-3 is a much more capable derivative of the PAC-2/GEM system in terms of both coverage and lethality. The PAC-3 has a new interceptor missile with a different kill mechanism--rather than having an exploding warhead, it is a hit-to-kill system. The PAC-3 missile is a smaller and highly efficient missile. The canister is approximately the same size as a PAC-2 canister but contains four missiles and tubes instead of a single round. Selected Patriot launching stations will be modified to accept PAC-3 canisters.
The Battalion Tactical Operations Center (BTOC) is an M900 series 5-ton expandable van that has been modified by the addition of data processing and display equipment, and utilized by the battalion staff to command and control the Patriot battalion. The BTOC allows the staff to perform automated tactical planning, communications link planning, and to display situational awareness information.
In the 1997 budget DOD added about $230 million for the PAC-3 through the Future Years Defense Program (FYDP) and established a realistic schedule to lower the program execution risk by extending the engineering and manufacturing development (EMD) phase of the program by ten months. System performance will be improved by re-phasing the missile and radar procurements; upgrading three launchers per battery with Enhanced Launcher Electronics Systems; and extending the battery's remote launch capability. PAC-3 Low-Rate Initial Production (LRIP) will begin in the second quarter of fiscal year 1998, and the First Unit Equipped (FUE) date is planned for the fourth quarter of fiscal year 1999. The FUE capability will consist of 16 missiles and five radars which will be placed in one battalion. As of 1996, in addition to funds being programmed for the Ballistic Missile Defense Organization, the Army planned to spend $9.6 billion for all planned purchases of Patriot missiles, $490 million for modifications and $335 million for product improvements.
The Patriot Advanced Capability 3 (PAC-3) Initial Operational Test and Evaluation (IOTE) began in 2002. The two major objectives of the Initial Operational Test and Evaluation (IOTE) are: (1) To assess the improvements in system performance provided by modifications in terms of operational effectiveness, suitability, and survivability; (2) to verify that modifications do not degrade the existing capabilities. The Initial Operational Test and Evaluation (IOTE) will be the first operational integration and assessment of the complete Patriot Advanced Capability 3 (PAC-3) Configuration 3 system.
The 2nd Battalion 43rd Air Defense Artillery/108th Air Defense Artillery Brigade serves as the test unit for the Initial Operational Test and Evaluation (IOTE). The unit is equipped with the complete package of Patriot Advanced Capability 3 (PAC-3) Configuration 3 hardware, PDB-5+ software and the Patriot Advanced Capability 3 (PAC-3) missile. The Patriot Project Office has issued the upgraded equipment to 2-43 Air Defense Artillery. 2-43 has completed New Equipment Training (NET) and supports testing necessary to obtain material release of the Patriot Advanced Capability 3 (PAC-3) Missile equipment.
The Initial Operational Test and Evaluation (IOTE) is conducted in four phases: (1) The Sustained Operations Phase is a five-day deployment to McGregor Range using approved tactics and doctrine. 2-43 Air Defense Artillery will defend against live aircraft in accordance with threat test support package in a simulated combat environment; (2) The Interoperability Phase is a six-day demonstration of the Patriot Advanced Capability 3 (PAC-3) interoperability with current Army and Joint Theater Missile Defense Systems. This phase is conducted using the Joint Common Simulated Missile Defense System Exerciser or actual tactical equipment; (3) The Flight Mission Simulator (FMS) Phase is a 22-day test of simulated air battles. The mobile Flight Mission Simulator (FMS) is a Patriot missile system simulation used to stimulate and evaluate radar performance, engagement decision and weapon assignment (EDWA) processing and test the Patriot Advanced Capability 3 (PAC-3)’s capabilities against a full spectrum of threat targets; (4) The Missile Flight Test Phase consists of four live missile tests conducted at White Sands Missile Range and Kwajalein Missile Range.
The Air Defense Artillery Directorate of the Operational Test Command conducts the planning and execution of the Initial Operational Test and Evaluation (IOTE). Once Initial Operational Test and Evaluation (IOTE) is complete, the Army Evaluation Center prepares the system evaluation report. This report provides input for the Patriot Advanced Capability 3 (PAC-3) missile Milestone III decision (full rate production) and the materiel release for the complete Patriot Advanced Capability 3 (PAC-3) system.
Four PAC-3 operational tests [some involving more than one interceptor launch] between February 2002 and May 2002 resulted in three launch failures, two misses and one hit that failed to destroy the incoming warhead. A malfunctioning radar and software problems led to the misses, and the launch failures resulted from electrical problems.
The Army received the first 16 PAC-3s -- a full launcher load -- in September 2001. The Army is authorized to produce the missiles at a rate of 72 a year, and Congress authorize an increase to 96 per year in fiscal 2003. The plan is to eventually produce 144 a year, leading to a total inventory of 1,159 interceptors. Unable to certify that the PAC-3 interceptor was ready for stepped-up production, in mid-2002 Pentagon put off the decision for at least a year, and planned on further testing once fixes are in place.
By early 2000 the cost of each PAC-3 missile had increased from $1.9 million to over $4 million, and the estimated total program cost had risen from $3.9 billion to $6.9 billion. After design and manufacturing modifications were initiated to control costs, the estimted cost per missile dropped to about $3 million, and as of mid-2002 program officials expected to reduce the unit cost to $2 million.
Initial reports of a successful intercept of a Patriot missile-as-target by a Pac-3 missile on 25 April 2002 have sinced proven to be incorrect. A US Army statement said that subsequent analysis showed that the Pac-3 impacted the target missile but failed to destroy the warhead, so the intercept was unsuccessful. A second Pac-3 in the same test failed to launch. A PAC-3 missile successfully intercepted a target ballistic missile over Kwajalein Atoll on 30 May 2002. A second missile, however, failed to launch for unknown reasons. A failure to launch also occurred in the last test on 25 April. The target was a modified Minuteman missile with a separating reentry vehicle. This was the last test in the Initial Operational Test and Evaluation (IOT&E) program, prior to a Pentagon assessment of PAC-3’s readiness for full-rate production.
As of late October 2002 the Army had taken delivery of 38 PAC-3 missiles, with another 15 due for delivery by December. The military is under contract to receive an additional 126 missiles over the 2003-2004 period. Congress increased the fiscal year 2003 budget request for PAC-3 of 72 missiles by an additional 48 missiles. In late November 2002, DOD approved plans to double PAC-3 monthly production rates, with the number of missiles increasing from four to eight per month after more manufacturing equipment and a second shift of personnel were added. DOD will acquire 108 PAC-3 missiles in FY 2004.
The overall procurement objective of 1,159 PAC-3 missiles remains unchanged. The larger purchases in FY-03 and FY-04 may be offset by lower production in FY-08 and FY-09. Instead of buying 216 missiles in each of those years, DOD would receive 184 units annually.
|
|

David
Fri March 21, 2003 6:49am
|
Patriot PAC-3 ERINT
Patriot Advanced Capability-3 (PAC-3) is a high/medium advanced surface-to-air guided missile air defense system. PAC-3 is a major upgrade to the Patriot system. The PAC-3 Operational Requirements Document (ORD) represents the Army Air Defense need to buy back required battlespace lost against the current and evolving tactical missile and air breathing threat. PAC-3 is needed to ounter/defeat/destroy the 2008 threat and to extend Patriot's capabilities to accomplish new/revised missions. In tandem with the upgraded radar and ground control station, PAC-3 interceptors can protect an area about seven times greater than the original Patriot system.
The PAC-3 Program consists of two interrelated acquisition programs - The PAC-3 Growth Program and the PAC-3 Missile Program. The Growth program consists of integrated, complementary improvements that will be implemented by a series of phased, incrementally fielded material changes. The PAC-3 Missile program is a key component of the overall improvements of the Patriot system, it will provide essential increases in battlespace, accuracy, and kill potential.
PAC-3 is a much more capable derivative of the PAC-2/GEM system in terms of both coverage and lethality. The PAC-3 has a new interceptor missile with a different kill mechanism--rather than having an exploding warhead, it is a hit-to-kill system. The PAC-3 missile is a smaller and highly efficient missile. The canister is approximately the same size as a PAC-2 canister but contains four missiles and tubes instead of a single round. Selected Patriot launching stations will be modified to accept PAC-3 canisters.
The Battalion Tactical Operations Center (BTOC) is an M900 series 5-ton expandable van that has been modified by the addition of data processing and display equipment, and utilized by the battalion staff to command and control the Patriot battalion. The BTOC allows the staff to perform automated tactical planning, communications link planning, and to display situational awareness information.
In the 1997 budget DOD added about $230 million for the PAC-3 through the Future Years Defense Program (FYDP) and established a realistic schedule to lower the program execution risk by extending the engineering and manufacturing development (EMD) phase of the program by ten months. System performance will be improved by re-phasing the missile and radar procurements; upgrading three launchers per battery with Enhanced Launcher Electronics Systems; and extending the battery's remote launch capability. PAC-3 Low-Rate Initial Production (LRIP) will begin in the second quarter of fiscal year 1998, and the First Unit Equipped (FUE) date is planned for the fourth quarter of fiscal year 1999. The FUE capability will consist of 16 missiles and five radars which will be placed in one battalion. As of 1996, in addition to funds being programmed for the Ballistic Missile Defense Organization, the Army planned to spend $9.6 billion for all planned purchases of Patriot missiles, $490 million for modifications and $335 million for product improvements.
The Patriot Advanced Capability 3 (PAC-3) Initial Operational Test and Evaluation (IOTE) began in 2002. The two major objectives of the Initial Operational Test and Evaluation (IOTE) are: (1) To assess the improvements in system performance provided by modifications in terms of operational effectiveness, suitability, and survivability; (2) to verify that modifications do not degrade the existing capabilities. The Initial Operational Test and Evaluation (IOTE) will be the first operational integration and assessment of the complete Patriot Advanced Capability 3 (PAC-3) Configuration 3 system.
The 2nd Battalion 43rd Air Defense Artillery/108th Air Defense Artillery Brigade serves as the test unit for the Initial Operational Test and Evaluation (IOTE). The unit is equipped with the complete package of Patriot Advanced Capability 3 (PAC-3) Configuration 3 hardware, PDB-5+ software and the Patriot Advanced Capability 3 (PAC-3) missile. The Patriot Project Office has issued the upgraded equipment to 2-43 Air Defense Artillery. 2-43 has completed New Equipment Training (NET) and supports testing necessary to obtain material release of the Patriot Advanced Capability 3 (PAC-3) Missile equipment.
The Initial Operational Test and Evaluation (IOTE) is conducted in four phases: (1) The Sustained Operations Phase is a five-day deployment to McGregor Range using approved tactics and doctrine. 2-43 Air Defense Artillery will defend against live aircraft in accordance with threat test support package in a simulated combat environment; (2) The Interoperability Phase is a six-day demonstration of the Patriot Advanced Capability 3 (PAC-3) interoperability with current Army and Joint Theater Missile Defense Systems. This phase is conducted using the Joint Common Simulated Missile Defense System Exerciser or actual tactical equipment; (3) The Flight Mission Simulator (FMS) Phase is a 22-day test of simulated air battles. The mobile Flight Mission Simulator (FMS) is a Patriot missile system simulation used to stimulate and evaluate radar performance, engagement decision and weapon assignment (EDWA) processing and test the Patriot Advanced Capability 3 (PAC-3)’s capabilities against a full spectrum of threat targets; (4) The Missile Flight Test Phase consists of four live missile tests conducted at White Sands Missile Range and Kwajalein Missile Range.
The Air Defense Artillery Directorate of the Operational Test Command conducts the planning and execution of the Initial Operational Test and Evaluation (IOTE). Once Initial Operational Test and Evaluation (IOTE) is complete, the Army Evaluation Center prepares the system evaluation report. This report provides input for the Patriot Advanced Capability 3 (PAC-3) missile Milestone III decision (full rate production) and the materiel release for the complete Patriot Advanced Capability 3 (PAC-3) system.
Four PAC-3 operational tests [some involving more than one interceptor launch] between February 2002 and May 2002 resulted in three launch failures, two misses and one hit that failed to destroy the incoming warhead. A malfunctioning radar and software problems led to the misses, and the launch failures resulted from electrical problems.
The Army received the first 16 PAC-3s -- a full launcher load -- in September 2001. The Army is authorized to produce the missiles at a rate of 72 a year, and Congress authorize an increase to 96 per year in fiscal 2003. The plan is to eventually produce 144 a year, leading to a total inventory of 1,159 interceptors. Unable to certify that the PAC-3 interceptor was ready for stepped-up production, in mid-2002 Pentagon put off the decision for at least a year, and planned on further testing once fixes are in place.
By early 2000 the cost of each PAC-3 missile had increased from $1.9 million to over $4 million, and the estimated total program cost had risen from $3.9 billion to $6.9 billion. After design and manufacturing modifications were initiated to control costs, the estimted cost per missile dropped to about $3 million, and as of mid-2002 program officials expected to reduce the unit cost to $2 million.
Initial reports of a successful intercept of a Patriot missile-as-target by a Pac-3 missile on 25 April 2002 have sinced proven to be incorrect. A US Army statement said that subsequent analysis showed that the Pac-3 impacted the target missile but failed to destroy the warhead, so the intercept was unsuccessful. A second Pac-3 in the same test failed to launch. A PAC-3 missile successfully intercepted a target ballistic missile over Kwajalein Atoll on 30 May 2002. A second missile, however, failed to launch for unknown reasons. A failure to launch also occurred in the last test on 25 April. The target was a modified Minuteman missile with a separating reentry vehicle. This was the last test in the Initial Operational Test and Evaluation (IOT&E) program, prior to a Pentagon assessment of PAC-3’s readiness for full-rate production.
As of late October 2002 the Army had taken delivery of 38 PAC-3 missiles, with another 15 due for delivery by December. The military is under contract to receive an additional 126 missiles over the 2003-2004 period. Congress increased the fiscal year 2003 budget request for PAC-3 of 72 missiles by an additional 48 missiles. In late November 2002, DOD approved plans to double PAC-3 monthly production rates, with the number of missiles increasing from four to eight per month after more manufacturing equipment and a second shift of personnel were added. DOD will acquire 108 PAC-3 missiles in FY 2004.
The overall procurement objective of 1,159 PAC-3 missiles remains unchanged. The larger purchases in FY-03 and FY-04 may be offset by lower production in FY-08 and FY-09. Instead of buying 216 missiles in each of those years, DOD would receive 184 units annually.
|
|

Unregistered
Sun March 23, 2003 9:56pm
|
Looking south
Kurdish soldiers in Chamchamal in Kurdish-controlled northern Iraq survey Iraqi army positions. Iraqi soldiers in the area reportedly opened fire several times Thursday morning while U.S. cruise missiles and bombs were falling on Baghdad.
|
|

David
Wed December 31, 2003 1:28am
|
Trying Times
Trying Times
|
|

David
Wed December 31, 2003 1:36am
|
Desperate Times, Desperat
Desperate Times, Desperate Measures
|
|

David
Sat January 3, 2004 8:19pm
|
Objective Individual Comb
The Objective Individual Combat Weapon (OICW) provides an enhanced capability for the 21st century infantryman, with the potential to selectively replace the M16 rifle, M203 grenade launcher, and M4 carbine. When fielded, the OICW dual munition system will provide superior firepower to the U.S. Army, Marine Corps, Air Force, Special Operations Command, Navy, and Coast Guard.
Program guidelines were derived from the Small Arms Master Plan (SAMP) and Joint Service Small Arms Master Plan (JSSAMP). OICW was managed by JSSAP during the Advanced Technology Demonstration (ATD) phase. For the PDRR/EMD phase, OICW management will transition to PM Small Arms with support provided by ARDEC.
Effective range to 1,000 meters
Full defilade target capability
Moving target tracking capability
KE semi two-round burst; HE semi automatic
Recoil level 1/3 that of the M14
Ruggedized composite weapon housing
Separable HE/KE weapons
Precise target range, automatically communicated to 20mm HE bursting ammo
Five times more lethal than the M16/M203, at > twice the range
Rate of fire with KE ammo >850 rounds/min, with HE >10 rounds/minute
Easily field strippable in under two minutes
Day/night fire control; weapon interface, iron sight backup
HE ammo functional modes: airburst, MOUT short arm, point detonation, point detonation delay, and self-destruct
Laser ranging accuracy ?1/2m out to 500m, ?1m out to 1000m
Weapon Operation
The fire control system (FCS), using a laser range finder, pinpoints the precise target range at which the HE round will burst and relays this information to the 20mm ammunition fuzing system. Fragments from the bursting munition will defeat PASGT body armor and incapacitate the target. The sighting system provides full 24-hour capability by employing uncooled IR sensor technology for night vision.
World-Class Team
For the ATD program, ATK served as system integrator, fuze developer and 20mm HE developer. ATK formed a strong international team, including Heckler & Koch (weapon), Contraves-Brashear Systems (fire control), Octec (video tracker), and Dynamit Nobel (KE and propellant support). For the PDRR/EMD program, the ATK team remains intact and will evolve a combat ready system.
|
|

David
Sun January 4, 2004 12:31am
|
SSN671 - USS Narwhal Fast
Function: One-of-a-kind prototype built off of the Sturgeon class SSN design.
History: Literally in a class by herself, the USS Narwhal was the only submarine of the Sturgeon class to be built with a prototype natural circulation nuclear reactor. Because the natural circulation powerplant did not need noise generating pumps to circulate the reactor coolant, at the time of her construction the Narwhal was the quietest submarine in the world. Coupled with the most advanced sensors and combat systems available, the Narwhal was without peer in the performance of her duties. Given her superior performance, Narwhal was ideally suited to perform intelligence gathering eavesdropping missions; during the course of her career Narwhal deployed overseas seventeen times and was awarded the Navy Unit Commendation, three Meritorious Unit Commendations, five Battle Efficiency "E" awards, four Engineering "E" awards, the Antisubmarine Warfare "A", the Communications "C", and the Supply "E" awards.
General Characteristics, USS Narwhal
Builders:
General Dynamics Electric Boat Division
Power Plant:
One S5W nuclear reactor, two steam turbines, one shaft, 15,000 shaft horse power
Date Deployed:
July 12, 1969; decommissioned January 5, 1999
Length, Overall:
314 feet (95.7 meters)
Beam:
38 feet (11.58 meters)
Draft:
28.8 feet
Displacement:
5,350 tons submerged
Speed:
20+ knots (23.02+ miles per hour, 37.05 +kph)
Crew:
120
Armament:
Mk 48 ADCAP Torpedoes, launched from 4 533mm torpedo tubes
Harpoon anti-ship missiles (tube launched)
Tomahawk anti-ship/ land attack missiles (tube launched)
Radar:
1 AN/BPS-14/15 navigation and fire control radar
Sonar:
1 TB-16 passive towed sonar array
1 TB-23 passive "thin line" towed sonar array
1 AN/BQG-5 wide aperture flank array
1 AN/BQQ-2/5 low frequency spherical bow sonar array
1 AN/BQS-12/13 active sonar array
1 AN/BQR-6 active sonar array (in submarines equipped with the BQQ-2)
1 AN/BQR-7 passive sonar array (in submarines equipped with the BQQ-2)
Optics:
1 Type 2 attack periscope
1 Type 18 search periscope
Countermeasures:
WLR-9 acoustic intercept receiver
WLQ-4 ESM
|
|

David
Thu January 8, 2004 3:22pm
|
Third Armored Division
Worn from: 15 April 1941 to 1991
Tab "Spearhead"
Activated at Camp Beauregard, Louisiana. The Arabic number three represents the division's designation. The tab recalls the numerous times when the Third was called upon to "spearhead the attack."
Campaigns:
WWII (Normandy, Northern France, Rhineland, Ardennes-Alsace, Central Europe), Armed Forces Expeditions (Saudi Arabia, Kuwait).
Decorations:
Presidential Unit Citation WWII (streamer embroidered MONS), French Croix de Guerre with Palm (streamer embroidered MONS), Belgian Fourragere 1940, cited in the Order of the Day of the Belgian Army for action in Belgium and action in the Ardennes.
|
|

David
Mon September 13, 2004 6:50am Rating: 10
|
XM8
The XM8 Future Combat Rifle is intended to replace existing M4 Carbines and select 5.56mm x45 weapons in the US Army arsenal beginning as early as the fourth quarter of FY05.
In October 2002 ATK (Alliant Techsystems) was awarded a $5 million contract modification from the U.S. Army Armament Research, Development, and Engineering Center (ARDEC), Picatinny, N.J., to develop the new XM8 Lightweight Assault Rifle. ATK Integrated Defense, Plymouth, Minn., and teammate Heckler and Koch, Oberndorf, Germany, will support the rapid development program, which will investigate the potential of the XM8 as the lightweight assault rifle for the Army's Objective Force.
The XM8 will be based on the kinetic energy weapon that is part of the XM29 next-generation infantry weapon system (formerly the Objective Individual Combat Weapon) currently under development by ATK Integrated Defense. The kinetic energy weapon, which fires 5.56mm ammunition, will provide maximum commonality in components and logistics with the XM29 system.
The XM8 will provide lethality performance comparable to the currently fielded M4 carbine rifle, while weighing 20 percent less than the M4 because of advanced technologies developed for the XM29 program.
The XM8 Lightweight Assault Rifle will reduce the 21st century soldier's load and increase his mobility - two very important aims of the Army's Objective Force Warrior and Land Warrior initiatives. The progress made to reduce weight and improve performance on the XM29 program is key to the decision on accelerating the development of the XM8, which is integrated with the Army's efforts to transform to a more lethal and rapidly deployed fighting force as part of its Objective Force.
ATK Integrated Defense is the system integrator on the XM29 program. Teammates on the program are Heckler and Koch, weapon development; ATK Ammunition Systems, Arden Hills, Minn., ammunition development; Brashear LP, Pittsburgh, Pa., integrated full solution fire control; and Omega, Columbus, Ga., training systems.
The XM8 is a true family of weapons with different barrel lengths designed to address all the needs of an infantry squad. The standard model is expected to be lighter than the M4 carbine and no larger in size. There?s also a sharpshooter version for increased range; a compact version for cramped quarters; and an auto-rifle version for a squad-automatic weapon. The XM8 family has a 9-inch compact, 12.5-inch carbine and a 20-inch sharpshooter and automatic rifle. The 12.5-inch carbine is 6.4 pounds with an objective of 5.7 pounds and is 33 inches with its adjustable stock extended. The M-16 A2 is 39.63 inches long and 8.79 pounds with a 30-round magazine.
Internally, the XM8 uses a rotary locking bolt system that functions and fieldstrips like those used in the M-16 rifle and M-4 carbine, according to the XM8 manufacturer?s ? Heckler & Koch ? Website. The bolt is powered by a unique gas operating system with a user-removable gas piston and pusher rod to operate the mechanism. Unlike the current M-4 and M-16 direct gas system with gas tube, the XM8 gas system does not introduce propellant gases and carbon back into the weapon?s receiver during firing.
While the XM8 was not exposed to battlefield conditions, it?s still a feat the current service rifle hasn?t come close to rivaling, said Rich Audette, deputy project manager for PM Soldier Weapons. During their Oct. 20-23 2003 trip to Germany, the weapons experts said they were impressed after watching Heckler & Koch engineers fire four high-capacity magazines, with 100 rounds a piece, in less than five minutes.
This improved reliability can be credited to differences in the XM8?s operating system from the one in the M16. For instance, a thin gas tube runs almost the entire length of the barrel in all of the M16 variants. When the weapon is fired, the gases travel back down the tube into the chamber and push the bolt back to eject the shell casing and chamber a new round. The XM8?s gas system instead is connected to a mechanical operating rod, which pushes back the bolt to eject the casing and chamber the new round each time the weapon is fired. So there?s no carbon residue constantly being blown back into the chamber, reducing the need to clean the weapon as often. You don?t get gases blowing back into the chamber that have contaminates in them. The XM8 also has a much tighter seal between the bolt and the ejection port, which should cut down on the amount of debris that can blow into the weapon when the ejection port?s dust cover is open.
The XM8 is part of the Army?s effort to perfect an over-and-under style weapon, known as the XM29, developed by Alliant Techsystems and H&K. It fires special air-bursting projectiles and standard 5.56mm ammunition. But the XM29 still is too heavy and unwieldy for Army requirements. Instead of scrapping the XM29, the Army decided to perfect each of XM29?s components separately, so soldiers can take advantage of new technology sooner. The parts would be brought back together when lighter materials become available. The XM8 is one of those components.
From December 2003 through late May 2004, soldiers got a chance to fire the prototypes in desert, tropical and arctic environments. A limited-user test then was conducted, possibly at Fort Campbell, Ky., where soldiers test the prototypes for about three weeks while training in offensive and defensive scenarios. Improvements will be made based on soldier and test feedback before the final three-months of operational tests, which are scheduled to begin in fall 2004. The final decision will be up to the Army?s senior leadership, but weapons officials said they were confident the XM8 weapon system will be adopted. If all goes well, the XM8 could be ready for fielding by late summer 2005.
Beginning life as the 5.56mm KE (kinetic energy) component of the 20mm air-bursting XM29 Objective Individual Combat Weapon (OICW), the XM8 Lightweight Modular Carbine System represents the state-of-the-art in 5.56x45mm NATO assault rifles. Developed by the US Army?s office of Project Manager for Soldier Weapons located at Picatinny Arsenal, New Jersey in close conjunction with the US Army Infantry Center, the XM8 Future Combat Rifle is intended to replace existing M4 Carbines and select 5.56mm x45 weapons in the US Army arsenal beginning as early as the fourth quarter of FY05. Once adopted, the M8 Carbine will replace the aging M16/M4 family of weapons, which have been in service for nearly four decades, longer than any previous US service rifle. The M8 Carbine will be up to 20% lighter than a comparably equipped M4 Carbine MWS and yet offer additional features and performance unavailable currently in any assault rifle in the world.
As a direct development of the separable OICW (XM29) KE or Kinetic Energy module, the M8 Carbine will share a high degree of common parts and training and maintenance procedures to lessen the required support for the ?family? of XM8 weapons. Being developed are four XM8 variants, which include a baseline carbine, a sharpshooter variant, an automatic rifle variant, and the ultra-compact carbine variant. A unique feature of the XM8 modular weapon system is the ability to easily and quickly reconfigure the weapon from one variant to the other to meet changing mission requirements, to include caliber conversion.
This modularity includes the exchange of interchangeable assembly groups such as the barrel, handguard, lower receiver, buttstock modules and sighting system with removable carrying handle. In addition and in parallel, the new XM320 quick detachable single-shot 40mm grenade launcher with side-opening breech and LSS lightweight 12 gauge shotgun module can be easily added to the XM8 by the user in the field without tools. The unique buttstock system allows the operator exchange buttstocks without tools from the standard collapsible multi-position version, to an optional buttcap for maximum portability or an optional folding or sniper buttstock with adjustable cheekpiece for special applications. Internally the XM8 employs a combat-proven robust rotary locking bolt system that functions and fieldstrips like that used in the current M16 rifle and M4 carbine. However this bolt is powered by a unique gas operating system that employs a user removable gas piston and pusher rod to operate the mechanism. Unlike the current M4/M16 direct gas system with gas tube, the XM8 gas system does not introduce propellant gases and the associated carbon fouling back into the weapon?s receiver during firing. This greatly increases the reliability of the XM8 while at same time reducing operator cleaning time by as much as 70%. This system also allows the weapon to fire more than 15,000 rounds without lubrication or cleaning in even the worst operational environments. A cold hammer forged barrel will guarantee a minimum of 20,000 rounds service life and ultimate operator safety in the event of an obstructed bore occurrence.
The XM8 has fully ambidextrous operating controls to include a centrally located charging handle that doubles as an ambidextrous forward assist when required, ambidextrous magazine release, bolt catch, safety/selector lever with semi and full automatic modes of fire and release lever for the multiple position collapsible buttstock. The operating controls allow the operator to keep the firing hand on the pistol grip and the weapon in the firing position at all times while the non-firing hand actuates the charging handle and magazine during loading and clearing. Major components of the weapon are produced from high-strength fiber reinforced polymer materials that can be molded in almost any color to include OD green, desert tan, arctic white, urban blue, brown and basic black. Surfaces on the XM8 that interface with the operator are fitted with non-slip materials to increase comfort and operator retention. The XM8 uses 10 or 30-round semi-transparent box magazines and high-reliability 100-round drum magazines for sustained fire applications.
Special integral flush mounted attachment points are located on the handguard and receiver to allow the quick attachment of targeting devices. Unlike MIL-STD-1913 rails, the XM8 attachment points do not add additional weight, bulk and cost to the host weapon, and will accept MIL-STD-1913 adapters to allow for the use of current in-service accessories. The attachment points for the standard multi-function integrated red-dot sight allow multiple mounting positions and insure 100% zero retention even after the sight is removed and remounted. The battery powered XM8 sight includes the latest technology in a red dot close combat optic, IR laser aimer and laser illuminator with back-up etched reticle with capability exceeding that of the current M68-CCO, AN/PEQ-2 and AN/PAQ-4. This sight will be factory zeroed on the weapon when it is delivered and does not require constant rezeroing in the field like current rail-mounted targeting devices. The XM8 will be fully compatible with future Land Warrior technology and components.
The US XM8 Carbine is being designed at the HK Defense design center in Sterling, Virginia and will be produced and assembled in the United States at the new Heckler & Koch manufacturing plant located in Columbus, Georgia, adjacent to Fort Benning. The unit cost of the XM8 will be less than that of the current M4 Carbine and will guarantee the American war fighter uncompromising performance far exceeding that of current in-service M4 Carbines.
XM-8 Prototype Specifications
Caliber:
5.56 x 45mm NATO
Builder:
Heckler & Koch
Weight:
6.4 lbs (prototype),
5.7 lbs objective
Overall Length:
33.3 inches (carbine stock extended)
Barrel Length:
Assault: 12.5"
Sharpshooter: 20.0"
Compact: 9.0"
Automatic Rifle: 20.0"
Rate of Fire:
Cyclic - 750 rpm
Sustained - 85 rpm up to 210 rounds
Rate of Twist:
1 in 7 inches
Barrel Life:
20,000 rounds mininum
Muzzle Velocity:
3005 feet/second (M855 Ball) with 20" barrel
2675 feet/second with 12.5" barrel
2365 feet/second with 9.0" barrel
Magazine Capacity:
10 or 30 rounds (magazines can be nested together); 100 round drum available
Stock:
5 position adjustable for length
Bayonet Lug:
Yes (12.5 & 20" barrels)
Bipod Interface:
Yes (20" only)
Sighting System:
Fully integrated red dot with laser illuminator and pointer
|
|

David
Tue October 5, 2004 2:54am
|
Iron Cross, Eisernes Kreu
Iron Cross, Eisernes Kreuz
The history of the Iron Cross dates back to her introduction as a Prussian decoration for merit by King Friedrich Wilhelm III of Prussia.1813. It was instituted as a direct result of the liberation war against Napoleon. Because of this institution it was more or less a campaign decoration.
After Napoleon defeated the Prussian army in 1807, it was forced to fight for the French cause. Right after Napoleons defeat at Moscow in December 1812, the Prussians resisted their oppressor. To commemorate that fact the Iron Cross was instituted on March 20th 1813. The design came from Karl Friedrich Schinkel, a Prussian architect.
The design was kept very simple. The core was made by a black cross, surrounded by a silver trim. The obverse side had an oak leave in the middle. Below that on the lower arm the year 1813 was placed. The upper arm was gifted with a crowned Royal Cipher ?FW?. The front side would be blank until the original obverse turned to front side in 1838. The decoration was instituted with three grade, the Grosskreuz (Grand Cross) for senior commanders and the 1. Klasse (1st Class) and 2.Klasse (2nd Class) for individual merit in combat. The 1st and 2nd Class crosses had a size of 42mm although examples are known within the sizes 28mm to 42mm. The 2nd Class cross contained an eye welded to the top with which it could be attached to a ribbon. At the backside of the 1sr Class cross two eyes were welded to be able to sew is to the uniform. The ribbon was black with on both sides a white stripe. Non-combatant receivers got the Iron Cross on a white ribbon with two black stripes. The Grand Cross was 62mm in size and was worn on a ribbon around the neck in the same colours.
The Iron Cross was only to be awarded in war times with the goal to replace the peacetime awards. In reality other awards like the Rote Adlerorden (Order of the Red Eagle) and the Pour le M?rite were also awarded.
After the Battle of Waterloo in 1815, the Iron Cross was not to be awarded until the ending of the Franco-Prussian war in 1871. The decoration was re instituted on July 19th 1870 as a campaign award for merit.
The front (original obverse) was kept unchanged, but became once again the obverse. On the renewed front the upper arm got a crown and the Royal Monogram ?W? was placed in the middle. The year 1870 was placed on the lower arm. After the Franco-Prussian War, the Iron Cross again wasn?t awarded until the outbreak of the First World War.
It was again renewed in 1914. The institution date for the new Iron Cross was August 5th 1914. The design was kept the same as the 1870 version, but the date of 1870 was replaced with 1914. The Iron Cross retained her three grades, but this time with a standard size of 42mm. The width of the ribbon could vary between 25mm and 30mm. The construction was unchanged with a blackened iron core surrounded with the silver trim. Because iron and silver became rarer during the war, later crosses were made of alloy and silvered plated trim.
In 1939 the Iron Cross again was renewed, this time as an order of the German Reich. The ribbon now got the Reich?s colours black white and red. In contrary to the old Imperial orders, the Iron Crosses grades all could be awarded regardless the military ranks. Also the Iron Cross became for the first time a real German decoration. Before that is was only awarded to Prussian military. The original symbolic Iron Cross was remained unchanged, but the old Imperial and Royal symbols were replaced by the new Reich symbol of the Swastika. The year was changed to 1939 as the new date of institution.
At the institution date, four grades were instituted, 2nd Class, 1st Class, Knights Cross and Grand Cross. The grades would be further extended during the war years. To commemorate actions of merit from the First World War, both the 1st Class (EK I) and 2nd Class (EK II) crosses could be worn in the form of a new clasp called a ?spange?, worn on a First World War ribbon. To obtain a higher grade, all lower grades had to be obtained first. In some cases EK II and EK I could be obtained at the same time. Even more rarely this also was done with higher grades. It was allowed to wear all grades at the same time, which was not a custom in other countries with comparable orders. Most recipients found the original decoration to be very valuable that they often bought cheaper replica at own costs. The original was mostly kept at home.
A grade in the Iron Cross could be awarded for different reasons. Beside actions of exceptional merit, it could also be obtained for successful military planning, courage in non military actions, exceptional leadership and even for merital actions done by the soldiers under the command of the recipient. The Iron Cross could be obtained by military within the whole Wehrmacht, military from Germany?s allies, but also by uniformed civilians.
After the Second World War the carrying of the Swastika and German World War 2 decorations for military and political activities were forbidden by law. In 1957 this law was changed. Decorations from the Second World War were permitted. The Swastika still is forbidden, but the decorations themselves could be worn again, when the Swastika was removed. Recipients of the Iron Cross got with this possibility their recognition for pure military merit and it lost her political history. To replace lost or broken examples and because many didn?t want to remove the Swastika from their historical item, in 1957 from most former military decorations a special denazified version was produced.
|
|

David
Tue October 5, 2004 2:56am
|
Grand Cross of the Iron C
Grand Cross of the Iron Cross,
Grosskreuz des Eisernen Kreuzes
The history of the Iron Cross dates back to her introduction as a Prussian decoration for merit by King Friedrich Wilhelm III of Prussia.1813. It was instituted as a direct result of the liberation war against Napoleon. Because of this institution it was more or less a campaign decoration.
After Napoleon defeated the Prussian army in 1807, it was forced to fight for the French cause. Right after Napoleons defeat at Moscow in December 1812, the Prussians resisted their oppressor. To commemorate that fact the Iron Cross was instituted on March 20th 1813. The design came from Karl Friedrich Schinkel, a Prussian architect.
The design was kept very simple. The core was made by a black cross, surrounded by a silver trim. The obverse side had an oak leave in the middle. Below that on the lower arm the year 1813 was placed. The upper arm was gifted with a crowned Royal Cipher ?FW?. The front side would be blank until the original obverse turned to front side in 1838. The decoration was instituted with three grade, the Grosskreuz (Grand Cross) for senior commanders and the 1. Klasse (1st Class) and 2.Klasse (2nd Class) for individual merit in combat. The 1st and 2nd Class crosses had a size of 42mm although examples are known within the sizes 28mm to 42mm. The 2nd Class cross contained an eye welded to the top with which it could be attached to a ribbon. At the backside of the 1sr Class cross two eyes were welded to be able to sew is to the uniform. The ribbon was black with on both sides a white stripe. Non-combatant receivers got the Iron Cross on a white ribbon with two black stripes. The Grand Cross was 62mm in size and was worn on a ribbon around the neck in the same colours.
The Iron Cross was only to be awarded in war times with the goal to replace the peacetime awards. In reality other awards like the Rote Adlerorden (Order of the Red Eagle) and the Pour le M?rite were also awarded.
After the Battle of Waterloo in 1815, the Iron Cross was not to be awarded until the ending of the Franco-Prussian war in 1871. The decoration was re instituted on July 19th 1870 as a campaign award for merit.
The front (original obverse) was kept unchanged, but became once again the obverse. On the renewed front the upper arm got a crown and the Royal Monogram ?W? was placed in the middle. The year 1870 was placed on the lower arm. After the Franco-Prussian War, the Iron Cross again wasn?t awarded until the outbreak of the First World War.
It was again renewed in 1914. The institution date for the new Iron Cross was August 5th 1914. The design was kept the same as the 1870 version, but the date of 1870 was replaced with 1914. The Iron Cross retained her three grades, but this time with a standard size of 42mm. The width of the ribbon could vary between 25mm and 30mm. The construction was unchanged with a blackened iron core surrounded with the silver trim. Because iron and silver became rarer during the war, later crosses were made of alloy and silvered plated trim.
In 1939 the Iron Cross again was renewed, this time as an order of the German Reich. The ribbon now got the Reich?s colours black white and red. In contrary to the old Imperial orders, the Iron Crosses grades all could be awarded regardless the military ranks. Also the Iron Cross became for the first time a real German decoration. Before that is was only awarded to Prussian military. The original symbolic Iron Cross was remained unchanged, but the old Imperial and Royal symbols were replaced by the new Reich symbol of the Swastika. The year was changed to 1939 as the new date of institution.
At the institution date, four grades were instituted, 2nd Class, 1st Class, Knights Cross and Grand Cross. The grades would be further extended during the war years. To commemorate actions of merit from the First World War, both the 1st Class (EK I) and 2nd Class (EK II) crosses could be worn in the form of a new clasp called a ?spange?, worn on a First World War ribbon. To obtain a higher grade, all lower grades had to be obtained first. In some cases EK II and EK I could be obtained at the same time. Even more rarely this also was done with higher grades. It was allowed to wear all grades at the same time, which was not a custom in other countries with comparable orders. Most recipients found the original decoration to be very valuable that they often bought cheaper replica at own costs. The original was mostly kept at home.
A grade in the Iron Cross could be awarded for different reasons. Beside actions of exceptional merit, it could also be obtained for successful military planning, courage in non military actions, exceptional leadership and even for merital actions done by the soldiers under the command of the recipient. The Iron Cross could be obtained by military within the whole Wehrmacht, military from Germany?s allies, but also by uniformed civilians.
After the Second World War the carrying of the Swastika and German World War 2 decorations for military and political activities were forbidden by law. In 1957 this law was changed. Decorations from the Second World War were permitted. The Swastika still is forbidden, but the decorations themselves could be worn again, when the Swastika was removed. Recipients of the Iron Cross got with this possibility their recognition for pure military merit and it lost her political history. To replace lost or broken examples and because many didn?t want to remove the Swastika from their historical item, in 1957 from most former military decorations a special denazified version was produced.
|
|

David
Tue October 5, 2004 3:00am
|
Knights Cross Golden Oakl
Knights Cross Golden Oakleaves with Swords and Diamonds ,
Ritterkreuz, Goldener Eichenlaub mit Schwertern und Brillianten
The history of the Iron Cross dates back to her introduction as a Prussian decoration for merit by King Friedrich Wilhelm III of Prussia.1813. It was instituted as a direct result of the liberation war against Napoleon. Because of this institution it was more or less a campaign decoration.
After Napoleon defeated the Prussian army in 1807, it was forced to fight for the French cause. Right after Napoleons defeat at Moscow in December 1812, the Prussians resisted their oppressor. To commemorate that fact the Iron Cross was instituted on March 20th 1813. The design came from Karl Friedrich Schinkel, a Prussian architect.
The design was kept very simple. The core was made by a black cross, surrounded by a silver trim. The obverse side had an oak leave in the middle. Below that on the lower arm the year 1813 was placed. The upper arm was gifted with a crowned Royal Cipher ?FW?. The front side would be blank until the original obverse turned to front side in 1838. The decoration was instituted with three grade, the Grosskreuz (Grand Cross) for senior commanders and the 1. Klasse (1st Class) and 2.Klasse (2nd Class) for individual merit in combat. The 1st and 2nd Class crosses had a size of 42mm although examples are known within the sizes 28mm to 42mm. The 2nd Class cross contained an eye welded to the top with which it could be attached to a ribbon. At the backside of the 1sr Class cross two eyes were welded to be able to sew is to the uniform. The ribbon was black with on both sides a white stripe. Non-combatant receivers got the Iron Cross on a white ribbon with two black stripes. The Grand Cross was 62mm in size and was worn on a ribbon around the neck in the same colours.
The Iron Cross was only to be awarded in war times with the goal to replace the peacetime awards. In reality other awards like the Rote Adlerorden (Order of the Red Eagle) and the Pour le M?rite were also awarded.
After the Battle of Waterloo in 1815, the Iron Cross was not to be awarded until the ending of the Franco-Prussian war in 1871. The decoration was re instituted on July 19th 1870 as a campaign award for merit.
The front (original obverse) was kept unchanged, but became once again the obverse. On the renewed front the upper arm got a crown and the Royal Monogram ?W? was placed in the middle. The year 1870 was placed on the lower arm. After the Franco-Prussian War, the Iron Cross again wasn?t awarded until the outbreak of the First World War.
It was again renewed in 1914. The institution date for the new Iron Cross was August 5th 1914. The design was kept the same as the 1870 version, but the date of 1870 was replaced with 1914. The Iron Cross retained her three grades, but this time with a standard size of 42mm. The width of the ribbon could vary between 25mm and 30mm. The construction was unchanged with a blackened iron core surrounded with the silver trim. Because iron and silver became rarer during the war, later crosses were made of alloy and silvered plated trim.
In 1939 the Iron Cross again was renewed, this time as an order of the German Reich. The ribbon now got the Reich?s colours black white and red. In contrary to the old Imperial orders, the Iron Crosses grades all could be awarded regardless the military ranks. Also the Iron Cross became for the first time a real German decoration. Before that is was only awarded to Prussian military. The original symbolic Iron Cross was remained unchanged, but the old Imperial and Royal symbols were replaced by the new Reich symbol of the Swastika. The year was changed to 1939 as the new date of institution.
At the institution date, four grades were instituted, 2nd Class, 1st Class, Knights Cross and Grand Cross. The grades would be further extended during the war years. To commemorate actions of merit from the First World War, both the 1st Class (EK I) and 2nd Class (EK II) crosses could be worn in the form of a new clasp called a ?spange?, worn on a First World War ribbon. To obtain a higher grade, all lower grades had to be obtained first. In some cases EK II and EK I could be obtained at the same time. Even more rarely this also was done with higher grades. It was allowed to wear all grades at the same time, which was not a custom in other countries with comparable orders. Most recipients found the original decoration to be very valuable that they often bought cheaper replica at own costs. The original was mostly kept at home.
A grade in the Iron Cross could be awarded for different reasons. Beside actions of exceptional merit, it could also be obtained for successful military planning, courage in non military actions, exceptional leadership and even for merital actions done by the soldiers under the command of the recipient. The Iron Cross could be obtained by military within the whole Wehrmacht, military from Germany?s allies, but also by uniformed civilians.
After the Second World War the carrying of the Swastika and German World War 2 decorations for military and political activities were forbidden by law. In 1957 this law was changed. Decorations from the Second World War were permitted. The Swastika still is forbidden, but the decorations themselves could be worn again, when the Swastika was removed. Recipients of the Iron Cross got with this possibility their recognition for pure military merit and it lost her political history. To replace lost or broken examples and because many didn?t want to remove the Swastika from their historical item, in 1957 from most former military decorations a special denazified version was produced.
|
|

David
Tue October 5, 2004 3:04am
|
Knights Cross Oakleaves,
Knights Cross Oakleaves, Swords and Diamonds
Ritterkreuz, Eichenlaub, Schwertern und Brillianten
The history of the Iron Cross dates back to her introduction as a Prussian decoration for merit by King Friedrich Wilhelm III of Prussia.1813. It was instituted as a direct result of the liberation war against Napoleon. Because of this institution it was more or less a campaign decoration.
After Napoleon defeated the Prussian army in 1807, it was forced to fight for the French cause. Right after Napoleons defeat at Moscow in December 1812, the Prussians resisted their oppressor. To commemorate that fact the Iron Cross was instituted on March 20th 1813. The design came from Karl Friedrich Schinkel, a Prussian architect.
The design was kept very simple. The core was made by a black cross, surrounded by a silver trim. The obverse side had an oak leave in the middle. Below that on the lower arm the year 1813 was placed. The upper arm was gifted with a crowned Royal Cipher ?FW?. The front side would be blank until the original obverse turned to front side in 1838. The decoration was instituted with three grade, the Grosskreuz (Grand Cross) for senior commanders and the 1. Klasse (1st Class) and 2.Klasse (2nd Class) for individual merit in combat. The 1st and 2nd Class crosses had a size of 42mm although examples are known within the sizes 28mm to 42mm. The 2nd Class cross contained an eye welded to the top with which it could be attached to a ribbon. At the backside of the 1sr Class cross two eyes were welded to be able to sew is to the uniform. The ribbon was black with on both sides a white stripe. Non-combatant receivers got the Iron Cross on a white ribbon with two black stripes. The Grand Cross was 62mm in size and was worn on a ribbon around the neck in the same colours.
The Iron Cross was only to be awarded in war times with the goal to replace the peacetime awards. In reality other awards like the Rote Adlerorden (Order of the Red Eagle) and the Pour le M?rite were also awarded.
After the Battle of Waterloo in 1815, the Iron Cross was not to be awarded until the ending of the Franco-Prussian war in 1871. The decoration was re instituted on July 19th 1870 as a campaign award for merit.
The front (original obverse) was kept unchanged, but became once again the obverse. On the renewed front the upper arm got a crown and the Royal Monogram ?W? was placed in the middle. The year 1870 was placed on the lower arm. After the Franco-Prussian War, the Iron Cross again wasn?t awarded until the outbreak of the First World War.
It was again renewed in 1914. The institution date for the new Iron Cross was August 5th 1914. The design was kept the same as the 1870 version, but the date of 1870 was replaced with 1914. The Iron Cross retained her three grades, but this time with a standard size of 42mm. The width of the ribbon could vary between 25mm and 30mm. The construction was unchanged with a blackened iron core surrounded with the silver trim. Because iron and silver became rarer during the war, later crosses were made of alloy and silvered plated trim.
In 1939 the Iron Cross again was renewed, this time as an order of the German Reich. The ribbon now got the Reich?s colours black white and red. In contrary to the old Imperial orders, the Iron Crosses grades all could be awarded regardless the military ranks. Also the Iron Cross became for the first time a real German decoration. Before that is was only awarded to Prussian military. The original symbolic Iron Cross was remained unchanged, but the old Imperial and Royal symbols were replaced by the new Reich symbol of the Swastika. The year was changed to 1939 as the new date of institution.
At the institution date, four grades were instituted, 2nd Class, 1st Class, Knights Cross and Grand Cross. The grades would be further extended during the war years. To commemorate actions of merit from the First World War, both the 1st Class (EK I) and 2nd Class (EK II) crosses could be worn in the form of a new clasp called a ?spange?, worn on a First World War ribbon. To obtain a higher grade, all lower grades had to be obtained first. In some cases EK II and EK I could be obtained at the same time. Even more rarely this also was done with higher grades. It was allowed to wear all grades at the same time, which was not a custom in other countries with comparable orders. Most recipients found the original decoration to be very valuable that they often bought cheaper replica at own costs. The original was mostly kept at home.
A grade in the Iron Cross could be awarded for different reasons. Beside actions of exceptional merit, it could also be obtained for successful military planning, courage in non military actions, exceptional leadership and even for merital actions done by the soldiers under the command of the recipient. The Iron Cross could be obtained by military within the whole Wehrmacht, military from Germany?s allies, but also by uniformed civilians.
After the Second World War the carrying of the Swastika and German World War 2 decorations for military and political activities were forbidden by law. In 1957 this law was changed. Decorations from the Second World War were permitted. The Swastika still is forbidden, but the decorations themselves could be worn again, when the Swastika was removed. Recipients of the Iron Cross got with this possibility their recognition for pure military merit and it lost her political history. To replace lost or broken examples and because many didn?t want to remove the Swastika from their historical item, in 1957 from most former military decorations a special denazified version was produced.
|
|
|