![]() |
Home | Forums | Gallery | Register | Video Directory | FAQ | Members List | Calendar | Games | Today's Posts | Search | Chat Room |
|
Before enlarging, click photo to ensure maximum resolution.
|
|
![]() |
|
David Administrator Registered: August 2001 Posts: 46,799 ![]() |
This conceptual drawing shows the new Virginia-class attack submarine now under construction at General Dynamics Electric Boat in Groton, Conn., and Northrop Grumman Newport News Shipbuilding in Newport News, Va. The first ship of this class, USS Virginia (SSN 774) is scheduled to be delivered to the U.S. Navy in 2004. U.S. Navy graphic courtesy of General Dynamics.
|
· Date: Fri December 20, 2002 · Views: 1273 · Filesize: 23.3kb · Dimensions: 600 x 471 · |
|
Additional Info | |
Keywords: This conceptual drawing s |
|