Home | Forums | Gallery | Register | Video Directory | FAQ | Members List | Calendar | Games | Today's Posts | Search | Chat Room |
|
|
Photo Details | |
David Administrator Registered: August 2001 Posts: 46,798 |
Function: A multi-purpose helicopter. VH-3D (HC-2) ? Executive Transport UH-3H (HC-85/PMRF/VC-8) ? Utility and Torpedo recovery SH-3H (HS-75) ? Carrier-based anti-submarine warfare UH-3H (HC-2/Naval Air Stations) ? Logistics/Search & Rescue History: The first version of this workhorse helicopter was flown more than 35 years ago. The Sea King has been replaced by the SH-60F Sea Hawk helicopters as the anti-submarine warfare helicopter. The transition was completed in the mid 1990s. The remaining Sea King helicopters have been configured for logistical support and search and rescue missions. Description: The H-3 is a twin engine, all-weather helicopter. The SH-3H model is used by the Navy Reserves to detect, classify, track and destroy enemy submarines. It also provides logistical support and a search and rescue capability. The UH-3H model is utility configured for logistical support and search and rescue missions. The VH-3D model supports the Executive Transport Mission. General Characteristics, H-3 Sea King Contractor: Sikorsky Aircraft Division of United Technologies, Stratford, CT Unit Cost: $6.4 million Power Plant: Two General Electric T58-GE-402 turboshaft engines Length: 73 feet (21.9 meters) Fuselage Length: 54 feet, 9 inches (16.5 meters) Height: 17 feet (5.1 meters) Weight: 11, 865 pounds (5,339 kilograms) empty 21,000 pounds (9,450 kilograms) maximum takeoff weight Speed: 120 knots (138 mph or 217.6 kmh) Ceiling: 14,700 feet (4,410 meters) Range: 542 nautical miles (623.3 statute miles or 997 km) Crew: Four Armament: Two Mk-46 torpedoes Date Deployed: First flight, March 1959 Operational, June 1961 |
· Date: Thu January 16, 2003 · Views: 1591 · Filesize: 36.7kb, 50.5kb · Dimensions: 758 x 504 · |
|
Additional Info | |
Keywords: H-3 Sea King |
|